Question:

10 points. help me with my grammar please. Thank you so much?

by  |  earlier

0 LIKES UnLike

English is my second language. I need to do this. Thank you so much.

*****

The following are some royal comments. “… His majesty the king claims building water gates to lead the water goes out of the east is an effective method to solve drought water, flood, brine issues. His Majesty the king convinces, after his consulting team calculate cost benefit analysis, building dams and water gates is the most efficient way to solve the issues and will save some cash in the long run. His Majesty the king believes building water gates get rid of brackish and increasing shrimps production as well as creating more agricultural and fishy careers…..”

Operating

The subcommittees from various ministries must work together to create effective and practicable that will produce the highest benefit for residents of Pakpanang. His Majesty has also hired several environment consultants to work with subcommittees and the royal irrigation workers. 7 November, 2538 the cabinet has officially approved the project, by the plan operating between 2538-2546, using budget money approximately 15,800,000,000 Thai baht. The project has three significant components includes: compose of construction side irrigation work; follows to correct environment effect; and development agricultural work in Pakpanang.

The Organization Operates

There are several executive committees and subcommittees as follows:

1.) Pakpanang River Basin Project Executive Committees

2.) Pakpanang River Basin Project Subcommittees

3.) Royal Irrigation Department Subcommittees

4.) Pakpanang River Basin Public Relations Project Subcommittees

5.) Pakpanang River Basin Agriculture System Subcommittees

Characteristic of the project

Pakpanang River Basin Project composes of four major components

1.) Irrigation construction: The Royal Irrigation Department was assigned to

be a project administrator, which budget is approximately 13,400,000,000 Thai baht. The project composes of various components includes constructing water gates and flood gates to release and obstruct Pakpanang River and building ridges to separate fresh water and brine water.

2.) Environmental Solution: Ministry of Science and Technology determines

pollution control area; Department of Fisheries develops law and regulations about the shrimp farms and its location; Agriculture and Cooperative Society for Agriculture Bank support special loans for farmers; other government sectors follow the same law and regulation as well as checking on-going environmental issues.

Results:

• Eradicate the weed in nature channel

• Build a pipe treats the dirty water from shrimps markets

• Construct a pipe treats the dirty water from local community

• Verify qualities of underground water, seawater, and soil

• Follow fishry resources around Pakpanang River area

3.) Developing Agriculture

Ministry of Science and Technology established the major policy

as follow: improve quality and quantity of rice production; encourage integrated

agriculture; organize shrimps farms and its locations; conserve soil, water, and other

environment; and develop organizations for agriculture.

Results:

• Rice production increases

• In-season rice farms increases

• Out-of-season rice farms increases

• Resuscitate shrimp industries

• Improve integrated agriculture

• Support other agricultural careers

4.) Public Relations

Pakpanang River Basin is a large project; therefore, public relations

plays significant role to communicate between the king, officials, and the residents.

Benefits

1.) Protect the trespass of the brine to agriculture land

2.) Create fresh water resources

3.) Diminish natural disaster

4.) Eliminate the argument between shrimp farmers and rice farmers

5.) Reduce migration issues

6.) Increase quality and quantity of agriculture product

7.) Improve quality of life

8.) Resuscitate overall Pakpanang’s ecology system

In conclusion, Pakpanang River Basin Project is one of three thousands

projects that the king proposes around the country. This project is an effective way to

to create many agriculture and fishery careers and improve qualities of life. As a

consequence, we can proudly say our beloved king is an intelligent, visionary,

and charismatic leader.

 Tags:

   Report

3 ANSWERS


  1. His  majesty, King ____, states building water gates in the east ___ will effectively solve a variety of water issues, including drought, flood, and brine.

    Pumpkin, you are asking too much.  You gave the whole report?  

    Find someone to write your report for you.  

    It will cost you money, though.


  2. Im sorry, but we can't let you get a good grade, for someone who did everything for you.

  3. The following are some royal comments. “… His majesty the king, claims building water gates to lead the water out of the east. It is an effective method to solve drought water, flood, and brine issues. His Majesty convinces the king, after his consulting team calculate cost benefit analysis, that building dams and water gates is the most efficient way to solve the issues, and will save some cash in the long run. His Majesty believes building water gates will rid of brackish and increase shrimp production as well as creating more agricultural and fishing careers…..”

    Operating

    The subcommittees from various ministries must work together to create effective and practicable operating systems that will produce the highest benefit for residents of Pakpanang. His Majesty has also hired several environmental consultants to work with subcommittees and the royal irrigation workers.

    November 7th, 2538 -  The cabinet has officially approved the project, by operating between 2538-2546, using budget money equivalent to 15,800,000,000 Thai baht. The project has three significant components which include: composition of construction side irrigation work; follows to correct environmental effects; and the development of agricultural work in Pakpanang.

    Characteristics of the project:

    Pakpanang River Basin Project composes of four major components:

    1.) Irrigation construction: The Royal Irrigation Department was assigned to a project administrator, whose budget is approximately 13,400,000,000 Thai baht. The project composes of various components including the construction of water gates, and flood gates to release and obstruct Pakpanang River, and building ridges to separate fresh and brine water.

    2.) Environmental Solution: Ministry of Science and Technology determines the pollution control area; Department of Fisheries develops laws and regulations about the shrimp farms and its location; Agriculture and Cooperative Society for the Agriculture Bank support special loans for farmers; other government sectors follow the same laws and regulations as well as checking on-going environmental issues.

    Results:

    • Eradicate weeds in the water channel

    • Build a pipe which treats the contaminated water from the shrimp market

    • Construct a pipe which treats the contaminated water from thlocal community

    • Verify qualities of underground water, seawater, and soil quality

    • Follow fishery resource data around the Pakpanang River area.

    3.) Developing Agriculture

    Ministry of Science and Technology established s major policy as follows: improve quality and quantity of rice production; encourage integrated agriculture; organize shrimp farms and their locations; conserve soil, water, and other environmental aspects; and develop organizations for agriculture.

    Results:

    • Rice production increases

    • In-season rice farm production increases

    • Out-of-season rice farm production increases

    • Resuscitate shrimp industries

    • Improve integrated agriculture

    • Support other agricultural careers

    4.) Public Relations

    Pakpanang River Basin is a large project; therefore, public relations

    play a significant role to communicate between the king, officials, and the residents.

    Benefits

    1.) Protect the land and agriculture from tresspassers

    2.) Create fresh water resources

    3.) Diminish natural disasters

    4.) Eliminate conflict between shrimp and rice farmers

    5.) Reduce migration issues

    6.) Increase quality and quantity of agricultural products

    7.) Improve the quality of life

    8.) Resuscitate Pakpanang’s overall ecology system

    In conclusion,  the Pakpanang River Basin Project is one of three thousand projects that the king proposes around the country. This project is an effective way to create many agricultural and fishery careers, as well as improve the quality of life. As a result, we can proudly say our beloved king is an intelligent visionary, and a charismatic leader.

Question Stats

Latest activity: earlier.
This question has 3 answers.

BECOME A GUIDE

Share your knowledge and help people by answering questions.
Unanswered Questions