Question:

After installing the 200 amp meter socket, How do I install the breaker box?

by  |  earlier

0 LIKES UnLike

I want to install the breaker box inside the building and provide the feed from the meter. From that point forward I want to install the wiring myself.

 Tags:

   Report

3 ANSWERS


  1. Before you do anything you need to check into getting a permit.

    I don't know where you live but a permit is usually a requirement and then you have to contact your utility company to have your power turned off to install your box.  This isn't a job for a novice.

    You could easily get in over your head if you're not experienced.

    My advice is do some more research before going forward with this project.


  2. Install the breaker box FIRST! Pull the meter before running the drop wires to the breaker box! This is a MUST!! Pulling the meter will kill the power to the drop poles in the meter socket so that you can install the drop leads to the breaker box without getting killed! Good Luck! ;-)=

  3. first you need an electrical permit from your jurisdiction to do the work,,,else you home will nt be covered by insurance