"Collins Class Submarine Story: Steel, Spies and Spin" alludes to the project.
<<In August 1991, because of the combat system schedule slippage, the contract was amended to provide a two-stage delivery. This was to allow submarine platform trials to proceed in advance of a fully compliant combat system being available.
In September 1993, ASC notified sub-contractor Rockwell of a default in contract (non-delivery of the combat system), but were not allowed by Defence to proceed and instead the delivery method was further changed from two-stage to multiple increments, with increasing functionality and complexity to be introduced with each delivery.>>
http://www.defence.gov.au
/minister/1999/collins.html
If the 1999 information is true, does it look like someone was causing mayhem ?
If we try and extrapolate backwards from 1993 to 1991 to earlier, I get an uncomfortable feeling.