0 LIKES LikeUnLike
There is electric and water down there that was done by someone else before we bought it. I am going to have an inspector check it out to make sure it is sound before I have the drywall done but do I actually need to apply for a permit beyond that. We aren't changing any of the electric or water down there just adding insulation and walls.
Tags:
Report (0) (0) | earlier
Latest activity: earlier. This question has 3 answers.