0 LIKES LikeUnLike
Someone tell me that how can I contact with sky news sport reporters?
Tags:
Respected sir,
The entire project is designed by considering the natural look of the sea shore. The project will not cause any problem to the natural beauty of the islands, coastal areas etc... The project will be present under the sand layers of the sea shore.
The project mainly consists of two parts they are:
Ø Tsunami project part.
Ø Commercial part and the project part.
Tsunami project part:
They are sub divided into many parts they were as follows:
v The BASE section
v SUPPORTING pillars 1
v PISTON section
v PISTON’S
v Main Piston pumping section
v PISTON BASE PART
v PISTON CONNECTING PIPES
v Valves
v Escalator 1 &2
v Lift section
v Parking place
v Layers
v Layer connected to the base section
Base section:
The base part is the one of the important section contains the layers arranged in an order. The piston rod will pass through the base part and lifts the layers present on the top of the base. When the danger occurs the layers present on the top of the base will be lifted up from the ground as soon as the wave comes and hit the layers the base part present at the bottom will provide the good support to the layers to withstand to those waves. There is another section which will be providing the additional support. The supporting pillars will provide the good support and make the entire base section as constant one without any deviation in the strange conditions. The base section and the supporting pillars where connected to each other.
The base section will be in the form of a block each and every block combines and form the single one. The front part of the base section will be thick while compared to the back part. The boundaries of the entire base part are made up of concrete and the internal part is completely filled up with the sand. The base part will have a small bend of 5 to 8 degrees so that they will give the support to the layer to oppose the waves. The first layer will also have the same bend of same angle so that both of them will get contact to each other tightly. There will be another small block of concrete inside the base section which will be giving the extra support for the layers. Because of this process the entire weight falls on the base part the base section is connected to the commercial section basement part so that it will be giving the extra support for the layers which were lifted from the ground to a certain height by doing this process each and every system will be connected to each other and increases the stability level of the system. Because of this process the damage ratio will also be reduced.
My address:
P.V.Ram Kumar,
D/o: 49-46-3/4,
Near jagga rao bridge,
Akkayyapalem,
Visakhapatnam pin: 530016,
Andhra Pradesh,
India.
Email id: ram_kumar_venkat85@yahoo.com
Phone no: +91 9985258219.
Report (0) (0) | 11 years ago
Latest activity: earlier. This question has 2 answers.