I run a flooring company, and am currently doing a large hotel(ceramic tile). The first floor concrete is in bad shape meaning humps and low spots. this has been mentionted to the concrete contractor and the general contractor numerous times. Small thing have been done to improve the problem but not near enough, and now its costing me alot of time and money in materials to get this job done. How can i go about being reminbursed for this lost time and material? If back bill the concrete company is the answer how might i go about that?