Been on holiday recently to a UK resort (W/S/Mare) they are building new sea defences, foundations have been dug quite deep and the concrete lorries were pouring their loads within a short space of time say 1 hour work men were removing plywood shuttering away from the concrete base as it looked set.How do they make concrete set so quick considering the tide was starting to come in.