0 LIKES LikeUnLike
i'm putting up 6 mil plastic as the vapor barrier and then 1/2" hardibacker. How do i put in a prefabricated niche in between the studs if the vapor barrier is already stapled over the studs? do i cut part of the vapor barrier out, place the prefab niche and then place cmb over? do i iinstall vb and cmb and then cut out the whole to fit the niche? wouldn't cutting the barrier render it useless?i need some help with this
Tags:
Report (0) (0) | earlier
Latest activity: earlier. This question has 1 answers.